Establishment History

  • July/2015 Set up Chin Jin Materials preparatory office,start equipment design and prepare outsourcing work.
  • August/2015 Approved by government and offically established Chin Jin Materials Co.,Ltd.
  • October/2015 Rent the current factory location.
  • January/2016 Begin installation of equipment and furnace sintering
  • February/2016 Mold design and furnace ceramic parts design & outsourcing
  • March/2016 Test high-frequency furnace,complete ceramic parts high temperature test and fine-tune equipment.
  • May/2016 Overcome ceramic parts problems,molds come back to our factory and pass thermal shock test
  • July/2016 Change Chairman
  • September/2016 Kaohsiung International Chemical & Instruments Expo
  • October/2016 Modify furnace copper coil
  • November/2016 Succeed at developing equipment and withdrawing φ6 mm 304 stainless steel
  • December/2016 Capital increased to 20,000,000 TWD
  • January/2017 Withdraw φ10 mm C276 alloy & 304 stainless steel successfully
  • February/2017 Expand the second production line,withdraw φ17 mm C276 hexagonal bar successfully