Establishment History
- July/2015 Set up Chin Jin Materials preparatory office,start equipment
design and prepare outsourcing work.
- August/2015 Approved by government and offically established
Chin Jin Materials Co.,Ltd.
- October/2015 Rent the current factory location.
- January/2016 Begin installation of equipment and
furnace sintering
- February/2016 Mold design and furnace ceramic parts design
& outsourcing
- March/2016 Test high-frequency furnace,complete ceramic parts high temperature
test and fine-tune equipment.
- May/2016 Overcome ceramic parts problems,molds come back to our
factory and pass thermal shock test
- July/2016 Change Chairman
- September/2016 Kaohsiung International Chemical &
Instruments Expo
- October/2016 Modify furnace copper coil
- November/2016 Succeed at developing equipment
and withdrawing φ6 mm 304 stainless steel
- December/2016 Capital increased to 20,000,000 TWD
- January/2017 Withdraw φ10 mm C276 alloy & 304 stainless steel successfully
- February/2017 Expand the second production line,withdraw φ17 mm C276 hexagonal bar successfully